One Year Out, Rio Continues Preparations For The 2016 Olympics

RIO DE JANEIRO, BRAZIL - JULY 25: Rubble from a partially demolished home remains in the Vila Autodromo 'favela' community, with the Olympic Aquatics Stadium construction ongoing in the background, on July 25, 2015 in the Barra da Tijuca neighborhood of Rio de Janeiro, Brazil. Most community residents have moved out and had their properties demolished after receiving compensation for their properties which are located directly adjacent to the Olympic Park being built for the Rio 2016 Olympic Games. A small fraction of remaining families from an original 700 or so are resisting the controversial evictions from the community and remain while experiencing random power and water outages. The 'favela' sprang from an old fishing village and was considered one of the city's safest. Evictions and demolitions continue in the area and have occurred in numerous other Rio communities with tangential links to the games. Much of the area in and around Olympic Park will be converted into high-end commercial properties following the games. August 5 marks the one-year mark to the start of the Rio 2016 Olympic Games. (Photo by Mario Tama/Getty Images)
RIO DE JANEIRO, BRAZIL - JULY 25: Rubble from a partially demolished home remains in the Vila Autodromo 'favela' community, with the Olympic Aquatics Stadium construction ongoing in the background, on July 25, 2015 in the Barra da Tijuca neighborhood of Rio de Janeiro, Brazil. Most community residents have moved out and had their properties demolished after receiving compensation for their properties which are located directly adjacent to the Olympic Park being built for the Rio 2016 Olympic Games. A small fraction of remaining families from an original 700 or so are resisting the controversial evictions from the community and remain while experiencing random power and water outages. The 'favela' sprang from an old fishing village and was considered one of the city's safest. Evictions and demolitions continue in the area and have occurred in numerous other Rio communities with tangential links to the games. Much of the area in and around Olympic Park will be converted into high-end commercial properties following the games. August 5 marks the one-year mark to the start of the Rio 2016 Olympic Games. (Photo by Mario Tama/Getty Images)
One Year Out, Rio Continues Preparations For The 2016 Olympics
ACHETER UNE LICENCE
Comment puis-je utiliser cette image ?
385,00 €
EUR
Getty ImagesOne Year Out, Rio Continues Preparations For The 2016 Olympics, Photo d'actualitéOne Year Out, Rio Continues Preparations For The 2016 Olympics, Photo d'actualitéOne Year Out, Rio Continues Preparations For The 2016 Olympics Obtenez des photos d'actualité haute résolution de qualité sur Getty ImagesProduct #:481984470
475€175€
Getty Images
In stock

INFORMATIONS

Restrictions :
Contactez votre agence locale pour toute utilisation commerciale ou promotionnelle.
Crédits :
Mario Tama / Employé
Editorial - n° :
481984470
Collection :
Getty Images News
Date de création :
25 juillet 2015
Date de chargement :
Type de licence :
Infos autorisations :
Autorisation non disponible. Plus d'infos
Source :
Getty Images South America
Référence :
86391787
Taille max. de fichier :
5184 x 3456 px (43,89 x 29,26 cm) - 300 dpi - 4 MB