Construction Continues On The Hoover Dam Bypass Project

LAKE MEAD NRA, NV - AUGUST 19: Obayashi Corp. cement mason Gus Gomez works in a suspended platform on the side of the Mike O'Callaghan-Pat Tillman Memorial Bridge section of the Hoover Dam Bypass Project August 19, 2010 in the Lake Mead National Recreation Area, Nevada. The 1,900-foot-long structure sits 890 feet above the Colorado River, about a quarter of a mile downstream from the Hoover Dam. The USD 240 million project to relieve vehicle traffic on the Hoover Dam began in 2003, and is scheduled to be open to traffic by November 2010. (Photo by Ethan Miller/Getty Images)
LAKE MEAD NRA, NV - AUGUST 19: Obayashi Corp. cement mason Gus Gomez works in a suspended platform on the side of the Mike O'Callaghan-Pat Tillman Memorial Bridge section of the Hoover Dam Bypass Project August 19, 2010 in the Lake Mead National Recreation Area, Nevada. The 1,900-foot-long structure sits 890 feet above the Colorado River, about a quarter of a mile downstream from the Hoover Dam. The USD 240 million project to relieve vehicle traffic on the Hoover Dam began in 2003, and is scheduled to be open to traffic by November 2010. (Photo by Ethan Miller/Getty Images)
Construction Continues On The Hoover Dam Bypass Project
ACHETER UNE LICENCE
Comment puis-je utiliser cette image ?
475,00 €
EUR

INFORMATIONS

Restrictions :
Contactez votre agence locale pour toute utilisation commerciale ou promotionnelle. Droits éditoriaux complets - Royaume-Uni, USA, Irlande, Canada (exclut le Québec). A l'exception de ces pays, les droits éditoriaux pour la presse quotidienne sont limités. Appelez-nous.
Crédits :
Ethan Miller / Employé
Editorial - n° :
103462440
Collection :
Getty Images News
Date de création :
19 août 2010
Date de chargement :
Type de licence :
Infos autorisations :
Autorisation non disponible. Plus d'infos
Source :
Getty Images North America
Référence :
61346229
Taille max. de fichier :
2273 x 3000 px (19,24 x 25,40 cm) - 300 dpi - 1 MB