Construction Of The Turkey-Northern Cyprus Undersea Water Pipeline

A dredging pontoon operates offshore beyond pipe sections stored for use at the construction site for the Northern Cyprus water supply project at a construction site operated by the Turkish State Hydraulic Works (DSI) in Guzelyali, North Cyprus, on Monday, Aug. 18, 2014. The 107-kilometer pipeline including onshore sections will link Alakopru Dam near Anamur on Turkey's coast to a dam being built in Gecitkoy, northern Cyprus. Photographer: Andrew Caballero-Reynolds/Bloomberg via Getty Images
A dredging pontoon operates offshore beyond pipe sections stored for use at the construction site for the Northern Cyprus water supply project at a construction site operated by the Turkish State Hydraulic Works (DSI) in Guzelyali, North Cyprus, on Monday, Aug. 18, 2014. The 107-kilometer pipeline including onshore sections will link Alakopru Dam near Anamur on Turkey's coast to a dam being built in Gecitkoy, northern Cyprus. Photographer: Andrew Caballero-Reynolds/Bloomberg via Getty Images
Construction Of The Turkey-Northern Cyprus Undersea Water Pipeline
ACHETER UNE LICENCE
Comment puis-je utiliser cette image ?
475,00 €
EUR

INFORMATIONS

Restrictions :
Contactez votre agence locale pour toute utilisation commerciale ou promotionnelle.For editorial use only. Additional clearance required for commercial or promotional use, contact your local office for assistance. Any commercial or promotional use of Bloomberg content requires Bloomberg's prior written consent.
Crédits :
Bloomberg / Contributeur
Editorial - n° :
453816552
Collection :
Bloomberg
Date de création :
18 août 2014
Date de chargement :
Type de licence :
Infos autorisations :
Autorisation non disponible. Plus d'infos
Source :
Bloomberg
Référence :
CYPRUS PIPELINE