Operations During Continued Construction At The Utah Valley Water Treatment Plant

A contractor works tapes up an air bag filter for a chemical injection system during construction of the Utah Valley Water Treatment Plant in Orem, Utah, U.S., on March 19, 2015. Upon completion the facility will be able to produce 80 million gallons of clean water a day. Photographer: George Frey/Bloomberg via Getty Images
A contractor works tapes up an air bag filter for a chemical injection system during construction of the Utah Valley Water Treatment Plant in Orem, Utah, U.S., on March 19, 2015. Upon completion the facility will be able to produce 80 million gallons of clean water a day. Photographer: George Frey/Bloomberg via Getty Images
Operations During Continued Construction At The Utah Valley Water Treatment Plant
ACHETER UNE LICENCE
Comment puis-je utiliser cette image ?
475,00 €
EUR

INFORMATIONS

Restrictions :
Contactez votre agence locale pour toute utilisation commerciale ou promotionnelle.For editorial use only. Additional clearance required for commercial or promotional use, contact your local office for assistance. Any commercial or promotional use of Bloomberg content requires Bloomberg's prior written consent.
Crédits :
Bloomberg / Contributeur
Editorial - n° :
467812352
Collection :
Bloomberg
Date de création :
19 mars 2015
Date de chargement :
Type de licence :
Infos autorisations :
Autorisation non disponible. Plus d'infos
Source :
Bloomberg
Référence :
UTAH WATER TREATMENT
Taille max. de fichier :
4000 x 2640 px (33,87 x 22,35 cm) - 300 dpi - 3 MB